Taped

Taped

The realigned section between km 229+850 and 231+500 still features a kerb installed as part of the improvement works on the National Special Surface Circuit.
The realigned section between km 229+850 and 231+500 still features a kerb installed as part of the improvement works on the National Special Surface Circuit.